​LOW COST STEEL STRUCTURE CHINA THE EXPERT GUIDE TO VALUE ENGINEERING INDUSTRY PROBLEM: INTERNATION

LOW COST STEEL STRUCTURE CHINA THE EXPERT GUIDE TO VALUE ENGINEERING

INDUSTRY PROBLEM: INTERNATIONAL BUYERS CHASING THE LOWEST POSSIBLE PRICE FREQUENTLY FALL VICTIM TO SEVERE UNDER ENGINEERING AND FAKE MATERIAL SUBSTITUTIONS RESULTING IN CATASTROPHIC BUILDING FAILURES.

TECHNICAL SOLUTION: IMPLEMENTING STRICT VALUE ENGINEERING PROTOCOLS OPTIMIZING SHIPPING DIMENSIONS AND DIRECT FACTORY SOURCING ACHIEVES TRUE LOW COST WITHOUT SACRIFICING STRUCTURAL INTEGRITY.

PROJECT VALUE: TRANSPARENT PROCUREMENT STRATEGIES ELIMINATE HIDDEN EXPORT BROKER FEES AND MAXIMIZE LONG TERM RETURN ON INVESTMENT FOR HEAVY INDUSTRIAL ASSETS.

THE DANGERS OF FAKE LOW COST ESTIMATES

SEARCHING FOR A LOW COST STEEL STRUCTURE CHINA SUPPLIER IS THE MOST DANGEROUS PHASE OF OVERSEAS PROCUREMENT. DURING MY FIFTEEN YEARS SUPERVISING EXPORT MANUFACTURING AS A CHIEF VALUE ENGINEER I HAVE SEEN COUNTLESS OVERSEAS DEVELOPERS DESTROY THEIR BUDGETS BY ACCEPTING ARTIFICIALLY LOW PER SQUARE METER QUOTATIONS.

YOU MUST UNDERSTAND THAT THE GLOBAL SPOT PRICE OF RAW STEEL IS HIGHLY TRANSPARENT. IF A CHINESE SUPPLIER OFFERS YOU A PRICE THAT IS TWENTY PERCENT BELOW THE MARKET AVERAGE THEY HAVE NOT DISCOVERED A SECRET MANUFACTURING TECHNIQUE. INSTEAD THEY ARE ACTIVELY UNDER ENGINEERING YOUR BUILDING. DISHONEST BROKERS WILL SECRETLY WIDEN THE DISTANCE BETWEEN PRIMARY PORTAL FRAMES REDUCE THE THICKNESS OF CRITICAL WEB PLATES AND COMPLETELY IGNORE YOUR LOCAL SEISMIC AND HEAVY WIND LOAD REQUIREMENTS JUST TO WIN THE INITIAL CONTRACT. WHEN THE BUILDING COLLAPSES DURING A STORM THE SUPPLIER WILL ALREADY BE GONE.

VALUE ENGINEERING HOW TO REDUCE COSTS SAFELY

TRUE LOW COST SOURCING DOES NOT MEAN BUYING CHEAP SCRAP METAL. IT MEANS ELIMINATING MANUFACTURING INEFFICIENCIES THROUGH SMART DESIGN. A PROFESSIONAL MANUFACTURING PARTNER WILL COLLABORATE WITH YOUR ARCHITECT TO IMPLEMENT VALUE ENGINEERING BEFORE PRODUCTION BEGINS.

  1. STANDARDIZING BAY SPACING. CUSTOMIZED IRREGULAR DISTANCES BETWEEN COLUMNS REQUIRE UNIQUE PURLIN LENGTHS AND EXTRA FABRICATION TIME. STANDARDIZING YOUR WAREHOUSE BAY SPACING TO EXACTLY SIX METERS ALLOWS THE FACTORY TO MASS PRODUCE IDENTICAL SECONDARY FRAMING COMPONENTS DRASTICALLY REDUCING MACHINE SETUP TIME AND LOWERING YOUR FINAL BILL.

  2. OPTIMIZING ROOF PITCH. A VERY STEEP ROOF PITCH INCREASES THE TOTAL SURFACE AREA OF THE ROOF CLADDING AND REQUIRES HEAVIER WIND BRACING. FLATTENING THE ROOF PITCH TO A SAFE ONE IN TEN RATIO SAVES MASSIVE AMOUNTS OF DEAD WEIGHT STEEL WHILE STILL MAINTAINING ADEQUATE RAINWATER DRAINAGE.

  3. AVOIDING CUSTOM ARCHITECTURAL CURVES. RADIUS BENDING HEAVY H BEAMS REQUIRES EXPENSIVE SPECIALIZED MACHINERY AND EXTREME METALLURGICAL HEATING. KEEPING YOUR DESIGN RECTANGULAR WITH STRAIGHT GEOMETRIC LINES IS THE FASTEST WAY TO SECURE A LOW COST STEEL STRUCTURE CHINA PROJECT.

SMART MATERIAL SELECTION Q235B VERSUS Q355B

SAVING MONEY REQUIRES KNOWING EXACTLY WHERE TO PLACE THE HEAVY METAL. YOU DO NOT NEED HIGH YIELD STEEL FOR EVERY SINGLE BOLT AND BRACE.

A HIGHLY EXPERIENCED CHINESE FABRICATOR WILL USE PREMIUM Q355B OR Q355C HIGH STRENGTH STEEL EXCLUSIVELY FOR THE PRIMARY LOAD BEARING COLUMNS AND CLEAR SPAN RAFTERS WHERE MAXIMUM STRESS OCCURS. HOWEVER TO LOWER YOUR OVERALL TONNAGE PRICE THEY WILL UTILIZE STANDARD Q235B STEEL FOR SECONDARY MEZZANINE PLATFORMS Z PURLINS AND INTERIOR NON LOAD BEARING PARTITION FRAMES. THIS HYBRID MATERIAL STRATEGY PERFECTLY BALANCES BUDGET CONSTRAINTS WITH RIGOROUS INTERNATIONAL SAFETY CODES. ALWAYS DEMAND MILL TEST REPORTS TO VERIFY THESE GRADES UPON DELIVERY.

SHIPPING CONTAINER OPTIMIZATION THE HIDDEN SAVINGS

MANY BUYERS FOCUS ENTIRELY ON THE EX WORKS FACTORY PRICE AND COMPLETELY FORGET THE DEVASTATING COST OF INTERNATIONAL OCEAN FREIGHT. HEAVY STRUCTURAL STEEL IS NOTORIOUSLY DIFFICULT TO EXPORT.

IF YOUR ENGINEER DESIGNS A MASSIVE ASSEMBLED ROOF TRUSS THAT IS TWELVE METERS WIDE IT CANNOT FIT INTO A STANDARD SHIPPING BOX. YOU WILL BE FORCED TO RENT EXTREMELY EXPENSIVE FORTY FOOT OPEN TOP OR FLAT RACK CONTAINERS WHICH CAN EASILY DOUBLE YOUR FREIGHT INVOICE. A TRUE VALUE ENGINEER WILL SPLIT THAT MASSIVE TRUSS INTO THREE BOLTABLE SECTIONS AT THE CHINESE FACTORY. THIS ALLOWS THE ENTIRE WAREHOUSE TO SLIDE PERFECTLY INTO STANDARD FORTY FOOT HIGH CUBE CONTAINERS. OPTIMIZING COMPONENT DIMENSIONS FOR MAXIMUM CONTAINER UTILIZATION IS THE ULTIMATE SECRET TO ACHIEVING A GENUINE LOW COST STEEL STRUCTURE.

EXPERT ENGINEERING FAQ FOR BUDGET BUYERS

HOW CAN A FACTORY OFFER A LOW COST BUT STILL MAINTAIN HIGH WELDING QUALITY?

THE ANSWER IS HEAVY AUTOMATION. BACKYARD SHOPS RELY ON CHEAP MANUAL LABOR WHICH PRODUCES INCONSISTENT FLAWED WELDS. A TIER ONE EXPORT FACILITY INVESTS MILLIONS IN AUTOMATED SUBMERGED ARC WELDING TRACTORS AND CNC PLASMA CUTTERS. THESE MACHINES OPERATE CONTINUOUSLY TWENTY FOUR HOURS A DAY WITH ZERO HUMAN ERROR. THIS MASS ECONOMY OF SCALE DRIVES DOWN THE LABOR COST PER TON ALLOWING THEM TO OFFER HIGH QUALITY METALLURGY AT HIGHLY COMPETITIVE EXPORT PRICES.

WILL A LOW COST BUILDING RUST FASTER THAN A REGULAR ONE?

IT ABSOLUTELY WILL RUST QUICKLY IF YOU SACRIFICE THE SURFACE TREATMENT. NEVER COMPROMISE ON PAINT. YOU CAN OPTIMIZE THE STEEL THICKNESS BUT YOU MUST INSIST THAT THE FACTORY USES AN ENCLOSED SHOT BLASTING MACHINE TO ACHIEVE AN SA 2.5 SURFACE PREPARATION. SPECIFY A MINIMUM DRY FILM THICKNESS OF ONE HUNDRED AND TWENTY MICRONS USING A QUALITY EPOXY PRIMER. SKIMPING ON PAINT SAVES YOU THREE PERCENT UPFRONT BUT COSTS YOU FIFTY PERCENT IN REPAIRS THREE YEARS LATER.

IS IT CHEAPER TO BOLT OR WELD THE BUILDING TOGETHER ON MY CONSTRUCTION SITE?

IT IS ALWAYS CHEAPER AND MUCH SAFER TO BOLT THE BUILDING TOGETHER ON SITE. FIELD WELDING REQUIRES HIRING EXPENSIVE HIGHLY CERTIFIED LOCAL WELDERS AND RENTING HEAVY GENERATORS. FURTHERMORE WELDING IN UNPREDICTABLE WEATHER LEADS TO POROSITY DEFECTS. A PROFESSIONAL CHINESE SUPPLIER WILL ONE HUNDRED PERCENT PRE FABRICATE AND PRE DRILL EVERY SINGLE CONNECTION IN THE FACTORY ALLOWING YOUR LOCAL WORKERS TO ASSEMBLE THE BUILDING WITH SIMPLE IMPACT WRENCHES LIKE A GIANT FURNITURE SET.

ACHIEVING A TRUE LOW COST STEEL STRUCTURE CHINA SOURCING VICTORY REQUIRES EXTREME VIGILANCE. YOU MUST SHIFT YOUR FOCUS AWAY FROM THE CHEAPEST PER KILOGRAM QUOTATION AND LOOK AT THE TOTAL INSTALLED COST. A METICULOUSLY ENGINEERED VALUE OPTIMIZED PRE DRILL PORTAL FRAME WILL SAVE YOU TENS OF THOUSANDS OF DOLLARS IN OCEAN FREIGHT AND LOCAL CRANE RENTAL HOURS. ALWAYS DEMAND TRANSPARENT MATERIAL CERTIFICATES AND PROOF OF CONTAINER LOADING OPTIMIZATION BEFORE RELEASING YOUR DEPOSIT.

low cost steel structure china,value engineering metal building,affordable steel warehouse,q235b vs q355b steel,shipping container optimization,pre engineered building cost,submerged arc welding automation,heavy steel export logistics


Article URL: http://www.steel999.com/index.php/post/2138.html
Copyright Notice: This is an original article, copyright © jinlong. You may share this article, but please retain the original source.

Comments are closed!